Before the start of construction of houses from glued beams turnkey, or any other wooden house, you must have a working draft.
All the information necessary for the implementation of projects of any complexity, contains a working draft. It includes: architectural conclusion of preliminary design, architectural drawings, structural calculations and diagrams. The same project is complemented engineering solutions for electricity, heating and ventilation, water supply and sanitation.
If necessary, develop solutions for communications networks, gas supply, installation of burglar alarm and other engineering systems. Not unimportant to all sections of the project to make lists of required building materials and specifications, as well as prepared for the construction of the planned estimates.
Ultimately, the project is implemented in a work about this set of documents:
- general explanatory note;
- master plan;
- relief organization;
- architectural solutions;
- technological solutions;
- constructive solutions;
- engineering equipment;
- project management plan;
- summary estimate of construction cost.
Detailed documentation of houses
On this basis, preparing working documents: drawings, specifications, diagrams, and other explanatory notes, intended for use on the construction site.
In the conduct of building a house turnkey of laminated veneer lumber or other wooden materials, you have to have the relevant documents at every stage, from laying the foundation to build the roof. As well as interior design projects and the development plan of the land plot.
Detailed documentation is required for construction, avoiding mistakes in the process of construction of the house and the quality control during the construction of the house with a key. It reflects the best solutions found during the design phase construction, which means it allows you to avoid unnecessary costs and ensures cost savings during construction.